Team Name: Online Health Monitoring System
Team Members:
CONTENTS:
Planned vs Actual Expenditures
Planned vs actual for each technical progress metric
We worked hard to wrap up integration. Our work load was much more than the planned work load. All major coding issues have been taken care of at this point. There were major code changes, but these are finished.
Planned vs Actual Expenditures
To
finish the code, we spent hours on integration even though none were scheduled.
Planned vs actual for each technical progress metric
It
is estimated that a little over 90% of the project is complete to date. We are back on schedule. We just have to finish Deliverables III
documentation.
See Appendix W14
The code is finished. It should be smooth from here on out. No concerns at this point.
Template created by G. Walton (GWalton@mail.ucf.edu) on
This page last modified by C. N. McCue
(christopher.mccue@knights.ucf.edu) on