Online Health Monitoring System

Project Management Report

COP 4331, Fall, 2014

 

Modification history:

Version

Date

Who

Comment

v0.0

08/15/00

G. H. Walton

Template

v1.0

09/27/14

C. N. McCue

Week 4 to Week 6 Bi-Weekly Report

...

 

 

 

 

 

Team Name: Online Health Monitoring System

Team Members:


 

CONTENTS:

Overall status

Planned vs Actual Expenditures

Planned vs actual for each technical progress metric

Updated PERT chart

Comments or Concerns 


Overall status

We are still on schedule.  Deliverables I was completed on time.  After the test, Deliverables II design should be in full swing.  No major problems have been encountered.  No major changes are expected.  There are no current issues. 


Planned vs Actual Expenditures

Phase II commenced on 9/19/14.  For week 6, progress was little.  However, it was expected that this week would be a recovery week from Deliverables I.


Planned vs actual for each technical progress metric

It is estimated that a little over 25% of the project is complete to date.


Updated PERT chart

See Appendix W6


Comments or Concerns 

Not too much has been accomplished concerning Detailed Design.  This was expected.  After Test 1, the project manager is planning to look at Chapters 5 and 6.  Then I plan to develop a sort of template so that it will be clearer to the team what they need to be doing for Detailed Design.


Template created by G. Walton (GWalton@mail.ucf.edu) on Aug 30, 1999 and last updated Aug15, 2000

This page last modified by C. N. McCue (christopher.mccue@knights.ucf.edu) on 9/13/2014