Cindy Harn
charn@knights.ucf.edu
COP4331 - Processes for Object Oriented Software Development - Fall 2014
Group 8 - CLASP Password Manager

Project Name: CLASP Password Manager

Team Website: http://www.cs.ucf.edu/courses/cop4331/fall2014/cop4331-8/

Webpages for Other Team Members:


Individual Weekly Time and Activity Log

Date Activity
09/02/2014 Set up "Individual Web Page". Created v0.0 for "Concept of Operations" and "System Requirements Specifications".
Verified "Team Webpage" and individual web pages of other team members made by Nigel Carter on 09/02/2014.
09/05/2014 Met up with all of the group members to discuss the project and worked on the Project Management Plan.
09/08/2014 Created v0.0 for "Test Plan".
Verified "Project Management Plan" made by Nigel Carter on 09/08/2014.
Checked and entered the details for the "Project Management Plan" as v1.0.
09/09/2014 Gathered with Nigel Carter and Mathew Church to meet with the assigned TA to discuss the requirements of the project.
09/10/2014 Created v0.0 for "Meeting Minutes".
Uploaded link to PMP document from 09/05/2014 group meeting for v1.0 of "Meeting Minutes".
09/11/2014 Wrote up and uploaded the notes into v1.1 of "Meeting Minutes" from the meeting with the TA on 09/09/2014.
09/12/2014 Met up with all of the group members to discuss the project and work on Deliverables I.
Finished and uploaded all of the sections to v1.0 of Concept of Operations page.
Uploaded link to ConOps document from 09/12/2014 group meeting for v1.2 of "Meeting Minutes".
Set up the tables for each group member's individual page.
09/16/2014 Met up with all except for one of the group members to continue with Deliverables I.
Finished and uploaded all of the sections to v1.1 of Project Management Plan page.
Uploaded link to PMP (Con.) document from 09/16/2014 group meeting for v1.3 of "Meeting Minutes".
09/18/2014 Met with most of the group members to briefly verify the completion of Deliverables I.
Finished and uploaded all of the sections to v1.0 of System Requirements Specification page.
Updated and uploaded the remainder of the sections to v1.1 of Test Plan page.
Uploaded link to SRS document and TPlan document from 09/18/2014 group meeting for v1.4 of "Meeting Minutes".
Contacted TA for a quick verification of the Deliverables I and then submitted the files.
09/19/2014 Met up with most of the group members to begin the discussion of the design of the project.
Created v0.0 for "High-Level Design" and for "Detailed Design" page.
Uploaded link to notes from 09/19/2014 group meeting for v2.0 of "Meeting Minutes".
09/26/2014 Met up with some of the group members to work on Deliverables II.
Uploaded link to cryptography notes for v2.1 of "Meeting Minutes".
10/03/2014 Met up with all of the group members to work on Deliverables II.
Checked and uploaded all the sections for v1.0 of "High-Level Design".
Uploaded link to "High-Level Design" Document as well as UI Pictures from 10/03/2014 group meeting for v2.2 of "Meeting Minutes".
10/07/2014 Gathered with Nigel Carter to meet with the assigned TA for a check-up on the progress.
10/10/2014 Met up with all of the group members to work on Deliverables II, GUI, and project specifics.
Updated v2.3 of "Meeting Minutes".
10/14/2014 Wrote up Design Issues section in the Detailed Design document and uploaded it as v1.0 of "Detailed Design".
10/17/2014 Met up with Nigel Carter and Thomas Bergens to work on Deliverables II and GitHub.
Updated v2.4 of "Meeting Minutes" as well as v1.1 of "Detailed Design".
10/19/2014 Assigned myself to a Feature on GitHub and worked a bit on implementing the PasswordRecoveryDialog UI.
10/20/2014 Set up the initial design / template of the Power Point presentation, which will be uploaded onto "Meeting Minutes".
10/21/2014 Met up with most of the group members to finish up on Deliverables II and discuss presentation specifics.
Updated v2.5 of "Meeting Minutes".
Worked on the Reset Password UI Feature.
Upgraded the design / layout of all of the webpages from the website.
10/23/2014 Met up with most of the group members to finish Deliverables II and verify the presentation.
Updated v3.0 then v3.1 of "Meeting Minutes" as well as v2.1 of "Detailed Design".
Fixed up the presentation to make sure everything is uniform and readable.
Submitted Deliverables II and printed out a hardcopy of the power-point.
Created v0.0 for "Test Results", "User's Manual", and "Source Code" for Deliverables III.
10/24/2014 Uploaded the link to the presentation onto the main webpage under Deliverables II.
Presented along with the group about Deliverables I + II as well as the prototype.
Created v0.0 for "Build Instructions" and "Project Legacy" for Deliverables III.
10/31/2014 Met up with Nigel Carter and Mathew Church to discuss the current status of the project.
11/06/2014 Began working on the User's Manual and updated v1.0 for "User's Manual".
11/07/2014 Met up with most of the group members to discuss the current status of the project.
Updated v3.2 of "Meeting Minutes".
Continued working on the User's Manual and keeping it up-to-date on the webpage.
11/18/2014 Met up with Nigel Carter and William Pearigen to discuss the current status of the project.
Finished the first draft of the User's Manual and updated it on "User's Manual" webpage.
11/19/2014 Completed v3.3 of "Meeting Minutes" and v1.0 of "Test Results" and v1.0 of "Project Legacy".
11/20/2014 Met up with all of the group members to continue working on the project.
Completed v3.4 of "Meeting Minutes".
11/21/2014 Met up with all of the group members to continue working on the project.
Completed v3.5 of "Meeting Minutes" and and v1.1 of "Project Legacy".
11/23/2014 Met up with all of the group members to continue working on the project.
Completed v3.6 of "Meeting Minutes", started testing the product, and created Deliverables III document plus the final presentation.
11/24/2014 Met up with all of the group members to discuss the presentation details.
Completed v3.7 of "Meeting Minutes" and uploaded the "Final Presentation".
11/25/2014 Met up with most of the group members to finish up Deliverables III.
Worked and completed the User's Manual.
Completed v3.8 of "Meeting Minutes", v1.2 of "Test Results", v1.1 of "User's Manual", v1.0 of "Source Code", v1.0 of "Build Instructions", and v1.2 of "Project Legacy".


Weekly Statements of Individual Progress and Status

Date Progress and Status
09/05/2014 Collaborated with Nigel Carter to keep the webpages up to date. Conducted the first group meeting to work on Deliverables I and will upload the work onto the webpages. Discussed among the group to decide dates and times for the meetings next week as well as the meeting with the TA for those whom can make the TA hours.
09/12/2014 Maintained the group website to keep all of the pages up to date. Performed the first meeting with the TA to establish the requirements of the project. Then met up with the group to work on Deliverables I, with the resulting completion of the Concepts of Operations. The remainder of the documents will be finished over the weekend and then checked together in another group meeting before uploading all four documents onto the web pages. Deliverables I will then be able to be verified during the second meeting with the TA next Tuesday.
09/19/2014 Finished Deliverables I and conducted the second meeting with the TA to confirm the current progress of the password manager project. Already began on the high-level design of the project and started to work on Deliverables II, so on track with the due dates and the progress to complete the project in time.
09/26/2014 Continued the High-Level Design document and discussed with the group the further specifics of the project before beginning the implementation of the project.
10/03/2014 Finished and uploaded the High-Level Design document as well as the documents/pictures from the group meeting. Decided on how the group will begin to start on the first prototype.
10/10/2014 Started working on Detailed Design document as well as the prototype for the project. The client commented on the progress of the status, and agrees a prototype should be presentable by the time for presentations.
10/17/2014 Deliverables II is approaching is completion, and is planned to be finished next Tuesday. Due to missing team members, the discussion of the presentation will be pushed back to next Tuesday as well. The prototype is starting to be developed and will be worked on until its completion, which will hopefully be by next Friday.


Log of Individual Technical or Management Issues and Their Resolution

Date Issue Resolution
09/11/2014 Sudden conflict in most of the group member's schedules, so could not meet up after class as planned. Performed a quick adjustment in the meeting time to 09/12/2014 after recitation, and met up for a longer time to compensate for the cancelled group meeting in order to work on Deliverables I.
10/19/2014 Individual issue of being unknowledgeable in the UI to easily implement the required features of the project. Such an issue can only be resolved by researching and learning by trial-and-error, before finally completing the assigned task. This also promotes experience in an unexplored field that may potentially be used later in the future.


Defect Log

Date Defect


Notes, Lessons Learned, Etc.

Date Comment
09/12/2014 Learned that it is easier to get a conceptual idea and process of developing the project once speaking with the client (which is the TA in this situation) to gather the major requirements.
10/14/2014 Did a check on the amount of time left before the submission of Deliverables II along with the presentation. Found out that time management and the level of work dedicated among with the group will play a crucial part in determining if a prototype will be ready to present by next week.
10/21/2014 Discovered that the continuous slack of even just one group member makes the rest of the group members have a more difficult time to plan confidently and always have to be prepared to make up for incomplete assigned work.


This page last modified by Cindy Harn (charn@knights.ucf.edu) on November 25, 2014.